Problem 5-18 (a)
 5-18 A food distribution company ships fresh spinach
 from its four packing plants to large East-coast cities.
 The shipping costs per crate, the supply and demand
 are shown in the table at the bottom of this page.
 (a) Formulate a model that will permit the company
 to meet its demand at the lowest possible cost.
 (b) The company wishes to spread out the source for
 each of its markets to the maximum extent possible.
 To accomplish this, it will accept a 5% increase in
 its total transportation cost from part (a). What is the
 new transportation plan, and what is the new cost?
 Shipments: To Flow balance equations
 From Atlanta Boston Charlestown Dover Flow out Location Flow in Flow out Net flow Sign RHS
 Eaglestown Eaglestown = -8000
 Farrier Farrier = -10000
 Guyton Guyton = -5000
 Hayesville Hayesville = -9000
 Flow in Atlanta = 8000
 Boston = 9000
 Unit costs: To Charlestown = 10000
 From Atlanta Boston Charlestown Dover Dover = 5000
 Eaglestown $6.0 $7.0 $7.5 $7.5
 Farrier $5.5 $5.5 $4.0 $7.0
 Guyton $6.0 $5.0 $6.5 $7.0
 Hayesville $7.0 $7.5 $8.5 $6.5

Total cost =

Problem 5-18 (b)
 5-18 A food distribution company ships fresh spinach
 from its four packing plants to large East-coast cities.
 The shipping costs per crate, the supply and demand
 are shown in the table at the bottom of this page.
 (a) Formulate a model that will permit the company
 to meet its demand at the lowest possible cost.
 (b) The company wishes to spread out the source for
 each of its markets to the maximum extent possible.
 To accomplish this, it will accept a 5% increase in
 its total transportation cost from part (a). What is the
 new transportation plan, and what is the new cost?

Shipments: To Flow balance equations
 From Atlanta Boston Charlestown Dover Flow out Location Flow in Flow out Net flow Sign RHS
 Eaglestown Eaglestown = -8000
 Farrier Farrier = -10000
 Guyton Guyton = -5000
 Hayesville Hayesville = -9000
 Flow in Atlanta = 8000
 Boston = 9000
 Unit costs: To Charlestown = 10000
 From Atlanta Boston Charlestown Dover Dover = 5000
 Eaglestown $6.0 $7.0 $7.5 $7.5
 Farrier $5.5 $5.5 $4.0 $7.0 5% Allowable Cost Increase < = 184275 Guyton $6.0 $5.0 $6.5 $7.0 Hayesville $7.0 $7.5 $8.5 $6.5 Max ship = Problem P 5-26 LOCATIONS EAST NORTH- EAST SOUTH- EAST CENTRAL Site 1 12 8 9 13 Site 2 10 9 11 10 Site 3 11 12 14 11 Site 4 13 11 12 9 Ambulance Locations Population Centers Flow balance equations East North-East South-East Central Flow out Location Flow in Flow out Net flow Sign RHS Site 1 0.0 0.0 1.0 0.0 1.0 Site 1 0.0 1 -1 = -1 Site 2 0.0 1.0 0.0 0.0 1.0 Site 2 0.0 1 -1 = -1 Site 3 1.0 0.0 0.0 0.0 1.0 Site 3 0.0 1 -1 = -1 Site 4 0.0 0.0 0.0 1.0 1.0 Site 4 0 1 -1 = -1 Flow in 1.0 1.0 1.0 1.0 Site 1 1 1 = 1 Site 2 1 1 = 1 Ambulance Locations Population Centers Site 3 1 1 = 1 East North-East South-East Central Site 4 1 1 = 1 Site 1 12.0 8.0 9.0 13.0 Site 2 10.0 9.0 11.0 10.0 Site 3 11.0 12.0 14.0 11.0 Site 4 13.0 11.0 12.0 9.0 Total Emergency Response Time 38 Problem 5-30 The city of Six Mile, South Carolina, is considering making several of its streets one way. What is the maximum number of cars per hour that can travel from east (node 1) to west (node 8)? The network is shown in Figure 5.20. ……………………………………………………………………………………………. Flows: To Flow balance equations From Node 1 Node 2 Node 3 Node 4 Node 5 Node 6 Node 7 Node 8 Flow out Node Flow in Flow out Net flow Sign RHS Node 1 Node 1 = 0.0 Node 2 Node 2 = 0.0 Node 3 Node 3 = 0.0 Node 4 Node 4 = 0.0 Node 5 Node 5 = 0.0 Node 6 Node 6 = 0.0 Node 7 Node 7 = 0.0 Node 8 Node 8 = 0.0 Flow in Capacities: To From Node 1 Node 2 Node 3 Node 4 Node 5 Node 6 Node 7 Node 8 Node 1 0 2 5 1 0 0 0 0 Node 2 0 0 0 0 2 0 0 0 Node 3 0 0 0 0 2 2 0 0 Node 4 1 0 0 0 0 3 0 4 Node 5 0 2 1 0 0 0 2 0 Node 6 0 0 2 0 0 0 0 4 Node 7 0 0 0 0 2 0 0 2 Node 8 1000 0 0 0 0 0 2 0 Max flow =

7-esl
Calculate your essay price
(550 words)

Approximate price: $22

How it Works

1

It only takes a couple of minutes to fill in your details, select the type of paper you need (essay, term paper, etc.), give us all necessary information regarding your assignment.

2

Once we receive your request, one of our customer support representatives will contact you within 24 hours with more specific information about how much it'll cost for this particular project.

3

After receiving payment confirmation via PayPal or credit card – we begin working on your detailed outline, which is based on the requirements given by yourself upon ordering.

4

Once approved, your order is complete and will be emailed directly to the email address provided before payment was made!